







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Trusted Home Additions & ADU for Garden Grove Homeowners
The squeeze usually starts small. A grown child moves back with a spouse. A parent needs a ground-floor bedroom with a bathroom that works. Or you’ve simply run out of quiet corners in a 1,300-square-foot ranch house off Chapman Avenue, and moving means giving up a street and neighbors you actually like. That’s when Garden Grove homeowners start pricing an addition or an accessory dwelling unit and discover the rules are complicated. We’re Barrett & Sons Construction, and we build these projects with the scope, allowances, and every price change written down before the work starts. Our crew members bring up to 28 years of experience, and a live person answers the phone 24 hours a day, seven days a week. Call (833) 703-5196 for a free estimate.
What Our Home Additions & ADU Service Includes
An addition or ADU is not one job. It’s framing, electrical, plumbing, insulation, finish work, and a stack of city paperwork that has to be right the first time. Here’s how we break it down in Garden Grove.
ADU Design & Permitting
This is the planning stage, where we lay out square footage, setbacks, and utility connections, then move the drawings through Garden Grove’s planning and building departments. You need it before anyone touches a shovel, because an unpermitted unit can be ordered vacated later and will complicate any future sale. We pull the permits and stand on site for the inspections, and we don’t hand you a permit number and disappear.

Garage Conversion ADU
Most Garden Grove lots have a detached or attached two-car garage that’s storing boxes, not cars. Converting it is often the fastest route to a rentable or family-ready unit, because the shell and slab already exist. We handle the framing changes, new electrical service, insulation, kitchenette, and bathroom, and we take care of the zoning check first, since not every lot clears the parking-replacement rules.

New Detached ADU
When the garage won’t cut it, a new detached unit in the backyard gives you the most privacy and the most leasable square footage. These run $90,000 to $220,000 depending on size, finishes, and how far we have to run utilities. We build them as full structures with their own entrance, meter considerations, and the same inspection schedule a main house gets.

Junior ADU & Interior Conversion
A junior ADU is a smaller unit carved inside the existing footprint, usually with a kitchenette and a dedicated entrance, and it’s often the cheapest path to adding housing on your property. We convert a bedroom suite, a den, or an underused back room. It suits a live-in parent or a long-term renter who doesn’t need a full kitchen.
ADU Site Prep & Utilities
Before a new unit goes up, the ground has to be ready. That means grading, trenching for water, sewer, and gas, running electrical, and coordinating with the city on any sewer lateral or water-meter upgrade. Garden Grove sits on flat, sandy soil that drains quickly, but older lots often have clay sewer lines at the end of their life, and we check that before we build over them.
Room Additions
A room addition extends the house itself: a primary suite, a family room, or a fourth bedroom for a growing household. These run $45,000 to $130,000 and depend on how much roof, foundation, and mechanical work the new square footage demands. We match the existing stucco, roofline, and window style so the house reads as one structure, not a bolted-on box.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
Brands We Work With for Home Additions & ADU
Windows and doors carry the look of an addition more than anything else in the build. We install ES Windows and ECO Window Systems on Garden Grove additions and ADUs, and we know the specific quirks of each: how the ES frame handles the wide temperature swings between an inland afternoon and a coastal evening, and where ECO’s vinyl extrusions hold up best on south-facing walls that take the sun all day. These are brands you can look up and compare, not mystery product off a van.
For the finish work inside, we bring the same premium-brand depth we use on kitchens and bathrooms, including KraftMaid cabinetry and Cambria surfaces if you’re building out an ADU kitchenette. Whether your plans call for ES Windows, ECO Window Systems, or another make, we can help you sort through the options before you commit to a line item.
Signs You Need Home Additions & ADU Right Now
- You’re turning the dining room into a bedroom. When furniture gets rearranged to make room for another person living under the roof, you’re already living in a smaller house than you need. That’s the point where an addition usually costs less than the compromises you’re making.
- Aging parent needs a ground-floor bathroom. Stairs become a real safety issue as parents age, and a junior ADU or a first-floor suite keeps family close without a nursing-home decision. It also keeps the household under one address.
- Your garage hasn’t held a car since 2019. If the garage is a storage unit with a door, a conversion can turn dead square footage into rentable space or a private suite. This is the most common ADU project we see in Garden Grove.
- You want rental income but not a landlord’s commute. A detached or converted ADU lets you collect rent from the backyard instead of a property across town, and long-term tenants are easier to manage from the house next door.
- Your equity is sitting in the dirt, not the house. Garden Grove lots are often bigger than the house on them, and that unused yard is value you already own. Building on it is a way to add square footage without buying a new home and paying today’s prices.
Our Home Additions & ADU Process – Step by Step
- 1
On-site walkthrough and feasibility check. A crew member walks the lot, looks at setbacks, utility runs, and the condition of the existing structure. We talk through what the city is likely to approve before you spend a dollar on drawings.
- 2
Scope and allowance review in writing. You get a line-item estimate covering framing, mechanical, finishes, and the allowances for items you’ll choose later, like tile and fixtures. Nothing in that estimate is verbal. If a number isn’t on paper, it’s a surprise waiting for a date, and we don’t work that way.
- 3
Design, permitting, and city review. We prepare the drawings and submit to Garden Grove’s planning and building departments, then track the plan-check comments and resubmittals. We pull the permit and pull it in the right name, because the last contractor most customers used told them permits were optional.
- 4
Construction with written change orders only. Framing, rough-in, insulation, inspections, then finish work. If anything changes mid-build, you get a written change order before a single nail moves. The permit inspector works for you, not for us, which is why we like him.
- 5
Final inspection and the 90-Day Done Right Promise. We walk the finished space with you, sign off with the city inspector, and hand over the job backed by our written 90-Day Done Right Promise. If something’s off, one call brings us back.
See the difference
Before
After
Before
After
Before
AfterHow Much Does Home Additions & ADU Cost in Garden Grove?

A home addition in Garden Grove typically runs $45,000 to $130,000 depending on square footage, whether you’re extending the roofline, and the finish level. ADU construction runs $90,000 to $220,000, and a garage conversion sits at $30,000 to $80,000, since the shell and slab already exist. Those ranges reflect what we actually see on local jobs, not a national average pulled from a spreadsheet.
What moves the number: the size and footprint, whether utilities have to be relocated, the condition of the existing foundation and framing, and your choice of finishes. A flat-roof addition on a mid-century ranch off Brookhurst costs less than a second story that has to match a pitched tile roof, and a simple ADU kitchenette costs less than a full one.
How to avoid overpaying: get the scope in writing, get your allowances in writing, and make sure every change order is signed before the work moves. Our free estimate is a line-item written quote, not a phone-ballpark, and it’s the same number we build from. Call (833) 703-5196 to schedule yours.
Home Additions & ADU Near Garden Grove – Our Service Area
We build additions and ADUs across Garden Grove and the towns around it, including Home Additions & ADU in Stanton, Home Additions & ADU in Westminster, Midway City, Cypress, Los Alamitos, Buena Park, and Fountain Valley. A crew member is usually twenty minutes from most of these, so site visits and inspections don’t eat a day in traffic. If you’re not sure whether your lot qualifies, call and we’ll tell you straight.
Serving Garden Grove, CA – Our Local Coverage Area
We serve Garden Grove and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently Asked Questions – Home Additions & ADU in Garden Grove

A home addition is new square footage added to your existing house, like an extra bedroom, family room, or primary suite. An ADU, or accessory dwelling unit, is a separate living space on the same lot with its own entrance and kitchen or kitchenette, and it can be a new detached structure, a garage conversion, or a junior unit carved inside the house. In Garden Grove, ADUs follow state law that broadened what’s allowed on single-family lots, including detached units and conversions. Call (833) 703-5196 and we’ll walk through which type fits your lot.
A garage conversion usually takes 3 to 5 months from permit to final inspection, while a new detached ADU or a second-story addition typically takes 6 to 10 months. The permitting phase alone can run a couple of months depending on plan-check backlogs and how quickly the city reviews. We give you a schedule up front and tell you when the setbacks are, not just the finish date.
Expect $45,000 to $130,000 for a home addition, $90,000 to $220,000 for a new detached ADU, and $30,000 to $80,000 for a garage conversion. The range reflects size, foundation work, utility relocations, and finish level. We give you a written line-item quote so you can see where the money goes. Call (833) 703-5196 for an exact number, and the estimate is free.
Yes, we install both ES Windows and ECO Window Systems on Garden Grove additions and ADUs, and we can help you compare them for your specific wall orientation and exposure. We also install doors and windows from other manufactures if your plans specify something else. The point is that you can look up every brand we install and check it yourself.
Yes, every eligible job has permits pulled and inspections signed before we build. An unpermitted ADU can be ordered vacated later, and it will complicate a sale or refinance down the road. The permit inspector works for you, not for us, and we’re on site for the inspections so nothing gets missed.
The 90-Day Done Right Promise is written into every contract and covers completed construction and remodeling work for 90 days after finish. If something isn’t right, one call brings our crew back to make it right. It’s not buried in fine print; it’s on the contract in plain language.
Start by gathering your property line, any prior permits, and a rough idea of how you want the space used, because city review depends on setbacks and existing conditions. Clear access to the yard or garage, and plan for a construction period with some noise and dust. We walk you through the rest at the first visit, and it costs nothing to find out if your lot works.
Schedule Your Home Additions & ADU Service in Garden Grove Today
A written estimate is the only way to know what your addition or ADU will really cost, and ours is free. Barrett & Sons Construction answers the phone 24 hours a day, seven days a week, and every price change arrives as a written change order before the work moves. Call (833) 703-5196 to schedule your no-obligation estimate in Garden Grove and get the scope in writing.
Written by the team at Barrett & Sons Construction.












